Beckrich Construction

719-598-9521
8855 Whispering Pine Trail
Colorado Springs, CO 80908
DBE • ESB

  • Federal
  • Commercial
  • Quality Control
  • Current Construction
  • About Us
    • Community
    • Gallery
    • Technology
    • Testimonials
    • Employment
    • News
  • H
  • C

Space Battalion Readiness Center Quality Control

Client: iiCON Construction Group / National Guard
Contract: Space Battalion Readiness Center
Contract Period: December 2018 – December 2020
Contract Amount: $16,160,316
Description of Work: Provide Quality Control Management to construct a 36,700 square foot building consisting of a steel frame with metal stud walls, exterior metal panels, standing seam and flat roofs, storefront and windows, site work, associated utility work, sediment and erosion control, and stormwater management. The project will include an emergency power generator backup for the facility; geothermal mechanical system, LED lighting, and automated HVAC controls. The building will be constructed to obtain LEED certified Silver Rating in accordance with USGBC LEED certification. Construction will be located on a 15-acre site at Ft. Carson, Colorado. Optional items of the contract will include: 6,615 SF west end of the facility; 3,096 sf unheated storage building; concrete pavers on satellite patio; three interior overhead doors at the assembly hall; operable partition, cabinets, and countertops in the classrooms; additional 2″ asphalt surface course on POV lot; landscaping; front entry patio, wall and sign; MDF wainscoting wall panels; and two high volume, low-speed ventilation fans in the entry hall.

Return to Quality Control Services Projects

News

General Contract with Pueblo Chemical Depot

Client: U.S. Army Contracting Office, Rock Island
Contract: Pueblo Chemical Depot IDIQ5
Contract Period: September 2020 – September 2022
Contract Value: $4,000,000

    Follow us

We accept Government Purchase Cards Beckrich Construction is E-Verified Beckrich Construction Company Chamber and EDC member

NEWS

Water Distribution System Construction Project

Client: Pueblo Chemical Depot
Contract: South Water Distribution System, Phase 2
Contract Period: October 2021 – April 2022
Contract Value: $398,274

More Posts from this Category

Copyright © 2025 · Beckrich Construction General Contractors · Methodical Webworks · Log in