Beckrich Construction

719-598-9521
8855 Whispering Pine Trail
Colorado Springs, CO 80908
DBE • ESB

  • Federal
  • Commercial
  • Quality Control
  • Current Construction
  • About Us
    • Community
    • Gallery
    • Technology
    • Testimonials
    • Employment
    • News
  • H
  • C

US Custom House Ceiling Repair

Client: U.S. General Services Administration
Contract: US Custom House Ceiling Repair
Contract Period: March 2020 – May 2020
Contract Value: $116,460
Description of Work: U.S. Customs House ceiling repair and/or removal of old plaster ceilings that were falling down. Protect furnishings, tag out the electrical, remove the existing electrical lighting fixtures that are located in the suspended grid assemblies, dismantle and store the existing suspended ceiling assembly, remove and dispose of the plaster ceilings in the effected areas, reassemble the existing suspended ceiling assembly, reinstall the existing lighting fixtures, replace the existing ceiling tiles, touch up paint, final clean, punch each area and turn over to GSA.

custom house general contractor
general contractors gsa

Return to Federal Projects

News

General Contract with Pueblo Chemical Depot

Client: U.S. Army Contracting Office, Rock Island
Contract: Pueblo Chemical Depot IDIQ5
Contract Period: September 2020 – September 2022
Contract Value: $4,000,000

    Follow us

We accept Government Purchase Cards Beckrich Construction is E-Verified Beckrich Construction Company Chamber and EDC member

NEWS

Water Distribution System Construction Project

Client: Pueblo Chemical Depot
Contract: South Water Distribution System, Phase 2
Contract Period: October 2021 – April 2022
Contract Value: $398,274

More Posts from this Category

Copyright © 2025 · Beckrich Construction General Contractors · Methodical Webworks · Log in