Client: U.S. General Services Administration
Contract: Wayne Aspinall Federal Courthouse Tuck Point & Sealant Repair Project, Grand Junction, Mesa County, Colorado
Contract Period: June 2020 – July 2020
Contract Amount: $15,547
Description of work: Repair mortar on granite stairs on the south and west sides of the building and seal sidewalk gaps and cracks surrounding the Wayne Aspinall Federal Courthouse.
US Custom House Ceiling Repair
Client: U.S. General Services Administration
Contract: US Custom House Ceiling Repair
Contract Period: March 2020 – May 2020
Contract Value: $116,460
Description of Work: U.S. Customs House ceiling repair and/or removal of old plaster ceilings that were falling down. Protect furnishings, tag out the electrical, remove the existing electrical lighting fixtures that are located in the suspended grid assemblies, dismantle and store the existing suspended ceiling assembly, remove and dispose of the plaster ceilings in the effected areas, reassemble the existing suspended ceiling assembly, reinstall the existing lighting fixtures, replace the existing ceiling tiles, touch up paint, final clean, punch each area and turn over to GSA.
Arraj Courthouse Wedge Barrier Replacement
Client: U.S. General Services Administration
Contract: Arraj Courthouse Wedge Barrier Replacement
Contract Period: March 2020 – October 2020
Contract Amount: $532,427
Description of Work: The project involved replacing the current wedge barrier at the Alfred A. Arraj Courthouse. Including design of a new system, demolition and removal of the existing wedge barrier system – involving barriers, loop, hydraulic lines, concrete and other assorted sub-systems. Installation of the new barrier system included concrete foundation, a new hydraulic system and a new barrier. Test, and clean-up were also performed. This work was completed without impact to the end user and their access to this important Federal Building.
Bullet Resistant Glazing Repair at Peterson Air Force Base
Client: Peterson Air Force Base
Contract: Repair bullet resistant glazing at guard houses on Peterson AFB
Contract Period: September 2019 – March 2020
Contract Value: $154,844
Description of Work Performed: Provide all management, tools, materials, parts, equipment and labor necessary to replace and dispose of bullet resistant blazing at the east and west gates at Peterson Air Force Base (PAFB), Colorado. Remove all existing bullet resistant glazing on buildings 1336 and 2015 and replace windows, to include UL rated level five bullet resistant glazing with solar glazing, sills, frames, and stiles on Peterson AFB.
AFA Flooring Restoration
Client: U.S. Air Force Academy
Contract: AFA Flooring Restoration
Contract Period: September 2019 – September 2020
Contract Amount: $131,046
Description of Work: Furnish all labor, materials, equipment and supervision necessary to refinish wood floors at the USAFA. The floors to be refinished are in multiple facilities on the Academy to include the Clune Arena building 2169, Racquetball Courts 1,2,3 in building 2170, and the Theater in building 2302.