Quality Control Services
Client: FSA, Inc. Architecture Construction for The Corps of Engineers
Contract: Interim Aircraft Maintenance Area Attack Battalion Maintenance Hanger, Fort Carson
Contract Period: July 2015 – July 2016
Contract Value: $3,848,000
Description of Work: Beckrich Site Quality Control Manager managed project documents, submittal register, daily reports, test reports, RFIs, conducted preparatory and initial meetings.
The project consisted of installing two Large Area Maintenance Shelters – approximately 15,000 SF each. The LAMS-A shall be clear-span, frame-supported, tension fabric structures of modular design with no internal posts or supports. LAMS-A shall include HVAC units, ventilation units, emergency personnel doors, interior lighting, fire alarm system, electrical power system, repair kits, and provisions for high wind. Project also included airfield pavements of concrete and asphalt, airfield lighting and storm drainage.