Client: Schriever Air Force Base
Contract: Schriever Gas Line Project
Contract Period: November 2015 – December 2015
Contract Value: $137,378
Description of work: Install a new 2” polyethylene gas line, branching off of the 6” main gas line. The new gas line serves 3 buildings on base. New isolation valves to each building were installed. In order to minimize disturbance to the base and roadways new gas line was bored under all crossings.